Template:Proposal: Difference between revisions

From ETHW
(Added new fields)
(Rearranged, added fields to fit new structure of form)
Line 46: Line 46:
----------
----------


'''What is the name of the proposed milestone?'''  
'''Year or range of years in which the achievement occurred:'''
 
[[Proposed Milestone Year::{{{a3|}}}]]
 
'''Title of the proposed milestone:'''  


[[Proposed Milestone Name::{{{a1|}}}]]
[[Proposed Milestone Name::{{{a1|}}}]]


''Plaque citation summarizing the achievement and its significance:'''
'''Plaque citation summarizing the achievement and its significance:'''


[[Proposed Milestone Plaque Citation::{{{plaque citation|}}}]]
[[Proposed Milestone Plaque Citation::{{{plaque citation|}}}]]


'''What is the location of the proposed milestone?'''
'''In what IEEE section(s) does it reside?'''  
 
[[Proposed Milestone Location::{{{a2a|}}}]]
 
'''In what IEEE section does it reside?'''  


[[Proposed Milestone IEEE Section::{{{a2b|}}}]]
[[Proposed Milestone IEEE Section::{{{a2b|}}}]]


'''In what year or years was the work performed?*'''
<h3>IEEE Organizational Unit(s) which have agreed to sponsor the Milestone:</h3>


[[Proposed Milestone Year::{{{a3|}}}]]
'''IEEE Organizational Unit(s) paying for milestone plaque(s):'''


'''What is the historical significance of the work (its technological, scientific, or social importance)?'''
{{{IEEE units paying|}}}


{{{a4|}}}
'''IEEE Organizational Unit(s) arranging the dedication ceremony:'''


'''What features set this work apart from similar achievements?'''
{{{IEEE units arranging|}}}


[[Milestone Distinguishing Features::{{{a5|}}}]]
'''IEEE section(s) monitoring the plaque(s):'''


'''What obstacles (technical, political, geographic) needed to be overcome?'''
{{{IEEE sections monitoring|}}}


[[Milestone Obstacles Overcome::{{{a6|}}}]]
<h3>Milestone proposer(s):</h3>


'''Describe briefly the intended site(s) of the milestone plaque(s). The intended site(s) must have a direct connection with the achievement (e.g. where developed, invented, tested, demonstrated, installed, or operated, etc.). A museum where a device or example of the technology is displayed, or the university where the inventor studied, are not, in themselves, sufficient connection for a milestone plaque'''.
{{{Milestone proposers|}}}


'''Please give the address(es) of the plaque site(s) (GPS coordinates if you have them). Also please give the details of the mounting, i.e. on the outside of the building, in the ground floor entrance hall, on a plinth on the grounds, etc. If visitors to the plaque site will need to go through security, or make an appointment, please give the contact information visitors will need. '''
'''Street address(es) and GPS coordinates of the intended milestone plaque site(s):'''  


[[Milestone Site Description::{{{a7|}}}]]
[[Proposed Milestone Location::{{{a2a|}}}]]


'''Are the original buildings extant?'''  
'''Are the original buildings extant?'''  
Line 99: Line 99:


[[Milestone Present Site Owner::{{{a10|}}}]]
[[Milestone Present Site Owner::{{{a10|}}}]]
'''What is the historical significance of the work (its technological, scientific, or social importance)?'''
{{{a4|}}}
'''What obstacles (technical, political, geographic) needed to be overcome?'''
[[Milestone Obstacles Overcome::{{{a6|}}}]]
'''What features set this work apart from similar achievements?'''
[[Milestone Distinguishing Features::{{{a5|}}}]]
'''Describe briefly the intended site(s) of the milestone plaque(s). The intended site(s) must have a direct connection with the achievement (e.g. where developed, invented, tested, demonstrated, installed, or operated, etc.). A museum where a device or example of the technology is displayed, or the university where the inventor studied, are not, in themselves, sufficient connection for a milestone plaque'''.
'''Please give the address(es) of the plaque site(s) (GPS coordinates if you have them). Also please give the details of the mounting, i.e. on the outside of the building, in the ground floor entrance hall, on a plinth on the grounds, etc. If visitors to the plaque site will need to go through security, or make an appointment, please give the contact information visitors will need. '''
[[Milestone Site Description::{{{a7|}}}]]


'''Has the owner of the site agreed to have it designated as an Electrical Engineering Milestone?'''  
'''Has the owner of the site agreed to have it designated as an Electrical Engineering Milestone?'''  
Line 107: Line 125:


[[Milestone IEEE OU Sponsor::{{{a12|}}}]]
[[Milestone IEEE OU Sponsor::{{{a12|}}}]]
'''References to establish the dates, location, and importance of the achievement:'''
[[Milestone References::{{{references|}}}]]
'''Supporting materials (supported formats: GIF, JPEG, PNG, PDF, DOC):'''
[[Milestone Supporting Materials::{{{supporting materials|}}}]]


{{ #if: {{CURRENTGROUP}} |
{{ #if: {{CURRENTGROUP}} |
Line 148: Line 174:
{{{a15Cemail|}}}
{{{a15Cemail|}}}
}}
}}
'''References to establish the dates, location, and importance of the achievement:'''
[[Milestone References::{{{references|}}}]]
'''Supporting materials (supported formats: GIF, JPEG, PNG, PDF, DOC):'''
[[Milestone Supporting Materials::{{{supporting materials|}}}]]
</includeonly>
</includeonly>

Revision as of 17:48, 8 June 2012

This is the "Proposal" template.